- • Šibenik-Knin County • http://myproject/projects/9914
The project involves construction and equipment of a dairy (cheese) factory with a capacity of 10,000 litres of processed milk in one shift with the intention of organising in the later phase the production in two shifts or 20,000 litres of processed milk per day. The aim of the construction of the dairy factory (dealing with the production of sheep and cow cheese) is to develop and improve dair...- • Virovitica-Podravina County • http://myproject/projects/9825
The project Dravacel envisages the construction of pulp and paper production plant with capacity of 185,000 tons per year and paper factory with capacity of 440,000 tons per year and construction of 10 MW geothermal power plant (co-generation of electricity and heat production from geothermal energy) and construction of 15 MW bio-power plant (co-generation of electricity and heat production from b...- • Istria County • http://myproject/projects/9770
The project Terra Istriana is situated on the building area of 14.75 ha total and it is owned by Terra Istriana Umag Llc. with concession rights for the seafront area. This is an integrated third‐generation tourism project The scope of the Terra Istriana Project is a construction of a high‐category tourist resort with a wide range of activities relating to leisure, culture and relaxation. ...- • Međimurje County • http://myproject/projects/9206
The project involves construction of a holistic Wellness & Health Resort & Green Energy production in several interrelated or independent phases that can be combined according to the interest of investor(s). Besides the developing indoor and outdoor thermal water park, spa premises, specialized hotels etc., an advanced geothermal power plant of new generation based on own sustainable geothermal so...